Project

Upgrade of Air Conditioning Systems at Client’s Offices

AT A GLANCE

Project Type cassete and midwall split installation
Client Location Harare Zimbabwe
Duration 6 weeks
Project Size 14 Units

Scope Of Work

This project involved the installation of 14 air conditioning units for a college to enhance the learning and working environment within various facilities. The installation aimed to provide effective temperature control and improve indoor air quality across classrooms, lecture halls, administrative offices, and other key areas of the college. By implementing these air conditioning systems, the college seeks to improve student comfort, productivity, and overall experience within the facilities.

The client is an educational institution that operates several colleges throughout the country. With a focus on providing a conducive learning environment for students and a productive workspace for staff, the client requires a cool and controlled environment within their facilities. This need is particularly critical for the protection and optimal operation of computer equipment and other sensitive technology used in various academic and administrative areas. Ensuring a comfortable temperature is also essential for the well-being and productivity of students and staff across the college’s operations.

Given the prevalence of power outages in the country where the college operates, the client had a specific requirement for the air conditioning systems. The client sought the installation of air conditioning units that are optimized to run efficiently on solar power, ensuring continued operation and maintaining a cool environment even during periods of grid power interruptions. This requirement necessitated the selection of high-performance air conditioners with compatibility for solar power integration, balancing the need for effective cooling with the practical considerations of the local power supply situation.

We installed air conditioners that utilize less power consumption while providing the best cooling experience. This selection ensured that the 14 air conditioning units could operate efficiently, particularly when powered by solar energy, addressing the client’s need for reliable cooling during power outages. By balancing low energy usage with high-performance cooling, the installed systems meet the requirements for a comfortable environment for students and staff, as well as for the protection of computer equipment in the college facilities.

The implementation of the air conditioning systems involved the careful selection and installation of 14 units that are optimized for low power consumption and high cooling efficiency. These air conditioners were installed in strategic locations across the college facilities to ensure effective temperature control in classrooms, lecture halls, administrative offices, and other key areas. The systems were configured for compatibility with solar power to address the client’s requirements for operation during power outages. Following installation, thorough testing was conducted to verify proper functioning of the air conditioning units and their ability to provide optimal cooling while minimizing power usage.

The low-power consumption air conditioning units, configured for solar power operation, have met the client’s requirements for reliable cooling during power outages. Students and staff are benefiting from the improved indoor conditions, contributing to enhanced productivity and learning experiences. Additionally, the efficient systems help protect sensitive computer equipment in the college’s academic and administrative areas. The project outcome aligns with the client’s operational needs in a location prone to power interruptions.